WEEK 16. 01-11-12.

PROGRESS:
timber frame roof going up.

window positions cut out.

some blockwork started in existing.










view from road

WEEK 16. 30-10-12.

PROGRESS:
 
timber frame going well.


some sheeting/ panels in place.

Roof structure may be put up today/ Friday.

concrete ring beam is cast to top of existing walls.
This has been a long job - 6-7 days in total.

bad weather today has stopped block laying.(Thursday)
Rain all day.




ring beam to top of existing walls.





Friday, 26 October 2012



WEEK 15. 26-10-12.
PROGRESS:
timber frame going great.

its going to look very well. 














Thursday, 25 October 2012

WEEK 15. 24-10-12.
 
PROGRESS:
 
timber frame started today!!!!

looks great.

beam that rings the top of the existing house.
master bedroom

looking good - timber frame

timber frame - will go up in a few days



    
looking good - timber frame 

Tuesday, 23 October 2012

WEEK 15. 22-10-12.
 
PROGRESS:
 
work begun at above first floor - beam will be cast in place on top to tie 4 walls together.
 
Engineer had a look and is happy.
 
Martin will order timber today for timber frame extension to rear.
 
This will start in the next few days.
 
Id imagine the old and new could be fully roofed before December.
 
Will give them a good chance to be indoors before the bad winter weather.
 
 
 
 



window to master bedroom

the timber will be the outside face of a form (mould) to be filled with concrete and steel reinforcement 

this beam rings the 4 sides of house to tie it all together

view at first floor

view at first floor



Sunday, 21 October 2012

WEEK 15. 19-10-12.
 
PROGRESS:
 
only got to site at end of week.
 
busy with another job Thurs and Friday.
 
 But there has been great progress...........Floor deck to first floor over existing house is complete.

Timber joists are laid out - propped on existing wall or hanging from walls. A timber plywood deck is laid out and its possible to walk on top - next will be a continuation of blockwork for walls to first floor up to roof level.
 
Also bits like front door, hallway and link between old and new coming on.


future front door - blocks stacked up at first floor level


edge to first floor level (existing house)

flue at first floor level.
(existing house)

porch at first floor level.
(existing house)


lily

Tuesday, 16 October 2012

WEEK 15. 12-10-12.
PROGRESS:
only got to site at end of day.

blockwork creeping up to above head height in places.

link between old and new  foundations poured and ready. 

we have opted for a block wall betwen oil boiler annd hallway - as opposed
to timber stud that was on drawings - blockwork safer.

they have also started on the repair of existing wall and will be putting blocks up there
Id imagine tomorrow. 
the man in white jacket has worked for 40 years on building sites and is finishing today - I brought him a bottle of whiskey!!


retaining wall finished and back filled


ESB box

work to top of wall




raft foundation to rear extension - just a mass slab of concrete really.