WEEK 10. 13-09-12.
PROGRESS:
much better today.full team on-site.
sub- floor and radon barrier lain in existing area.
and sub-floor to new bedroom and hall.
both areas should be ready for pouring concrete
floor by Monday.
pipes also put in place for these areas for downstairs w.c.
and en-suite.