Friday, 27 July 2012

WEEK 03. 26-07-12.
PROGRESS:
Embankment to rear  is stripped bare and levelling out begun.
Embankment to rear is to be made level at approx. 1.5 meter
above finished floor level of present house.





TO DISCUSS:
Dormer windows are of poor standard and need replacing - engineer has confirmed that
they are unsafe and need replacement rather than repair. 


Town architect has inspected dormer windows - and will write letter to allow
demolish and replacement rather than repair. (see below)
It is thus proposed to remove  the 2 dormers shown in red below.